Line 3, Chongqing Rail Transit

Line 3
三号线

Statistics
Type Straddle-beam monorail
System Chongqing Rail Transit
Status Ltd Operation
Termini Ertang
Longtousi
No. of stations 29
Operation
Opened 29 Sept 2011
Operator(s) Chongqing Rail Transit Corp., Ltd
Technical
Line length 39.1 km

Chongqing Rail Transit Line 3 runs from north to south, linking the districts separated by Chongqing's two main rivers, the Yangtze (Chang Jiang) and Jialing rivers. The first phase of the line began construction on 5 April 2007. The initial segment from Lianglukou to Yuanyang (18 stations, 17.5 km) opened on September 29, 2011, with the full length from Ertang to Jiangbei Airport opening on December 30, 2011.[1]

There are interchange stations in central Yuzhong district for transfer with Line 1 at Lianglukou, and with Line 2 at Niujiaotuo.

Stations

Station Code
Station Name
English
Station Name
Hanzi
Platform Types
Transfer
Location
3/18 Lianglukou 两路口 side (und)  Line 1  Yuzhong
3/19 Niujiaotuo 牛角沱 side (elv)  Line 2 
3/20 Huaxin Street 华新街 side (elv) Jiangbei
3/21 Guanyinqiao 观音桥 island (und)
3/22 Hongqiaohegou 红旗河沟 side (und) Yubei
3/23 Jiazhou Road 嘉州路 side (elv)
3/24 Zhengjiayuanzi 郑家院子 side (elv)
3/25 Shiziping 狮子坪 side (elv)
3/26 Tangjiayuanzi 唐家院子 side (elv)
3/27 Chongqing North Railway Station 重庆北站 side (und)
3/28 Longtousi 龙头寺 side (elv)
3/29 Tongjiayuanzi 童家院子 side (elv)
3/30 Yinyu 金渝 side (elv)
3/31 Yinyu Road 金童路 side (elv)
3/32 Yuanyang 鸳鸯 side (elv)

References